Design Optimization and Consultancy Services for the Third Shitalakhya Bridge in Bangladesh.
Time:Jan 22,2021Hits:Hits:-
Design and Consulting, since February, 2019
The designed bridge is 1309 meters long and 22.15 meters wide.