Inner Ring Road Reconstruction (Phase II) in Katmandu, Nepal
Time:Jan 28,2021Hits:Hits:-

Feasibility Study

Since 2013.12,

This project is in Katmandu, the capital of Nepal, with a total length of 10369m, a width of 15.5m and a design speed of 50km/h. The reconstruction project includes maintenances and reconstruction of 2 main bridges, 4 new auxiliary bridges, 16 new subsidiary culverts and 82 new ditch culverts, as well as 5 new overpasses.

Inner Ring Road Reconstruction (Phase II) in Katmandu, Nepal

Inner Ring Road Reconstruction (Phase II) in Katmandu, Nepal

Inner Ring Road Reconstruction (Phase II) in Katmandu, Nepal