The Section 6 of Chisinau Ring Road in Moldova
Time:Jan 28,2021Hits:Hits:-
Survey and Design, Since April, 2019
The section 6 of Chisinau Ring Road is a new road project with length of 32km(k0+000-k32050). It was designed as two-way four-lane access controlled expressway, with the width of 25 m, designed speed of 100km/h, followed the Class Ib, according to the local specification of Moldova. 17 bridges with total 417 meters long, 36 culverts and 3 interchanges were designed.