Sand Table Model of Cable Stayed Bridge of Shangqiu-Dengfeng Expressway Crossing South-north Water Transfer Canal
Time:Jan 27,2021Hits:Hits:-
The sand table model of the bridge is installed in the meeting room of the construction site, and is made at the ratio of 1:100. It is 5.5m long, 1m wide and 1.6m high. The whole model demonstrated the overall view of the bridge, giving visitors an intuitive feeling.